Friday, 15 June 2018

NTPC plans to load cheaper power first, plans new despatch schedule

About half of NTPC's 40.4 Gw coal-based installed capacity, generates power at Rs 3 or lower. The company will add a 5,000-Mw coal-based capacity this year

from Latest News https://ift.tt/2y9RAk1

No comments:

Post a Comment